Kairanga Solar Farm - 27MWp
Kiwi Solar has undertaken early stage development activities on the project, including acquiring suitable land, managing the grid connection process and pre-consenting works (geotech, flood studies, design optimisation).
In August 2024, Lodestone Energy aquired the project at late development stage.
ARTIST'S RENDITION
Key Facts
- ~27MWp
- Tracker System
- estimated 38,500MWh of energy generation per year once operational.
The 45Ha site makes a good location for a solar farm due to flat nature and proximity to suitable power line connection.